Bay Networks 4000 Guida di Installazione Pagina 156

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 162
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 155
Remote Annex 4000 Hardware Installation Guide
Appendix C Port Upgrade Instructions
C-8
2 Secure the cover and cable retainers using ten screws
(see
Figure C-10).
Do not over-tighten these screws (beyond 10 in-
lbs. of torque).
Figure C-10. Securing the Cover
Power-up and Test
The following instructions describe the power-up and test sequence.
1 Reconnect all the cables, including:
The transceiver cable.
Existing cables for the serial devices.
The parallel printer cable.
The console terminal cable.
The power cord.
Vedere la pagina 155

Commenti su questo manuale

Nessun commento